
Asphalt
If you can dream it, we can build it.
Asphalt paving for commercial and residential — new parking lot installation, driveway paving, full-depth replacement, mill and overlay, crack seal, sealcoat, and restriping. Maintenance programs that extend pavement life and defer the next full replacement.
Parking Lots · Driveways · Mill-And-Overlay · Sealcoat
new pavement · full-depth replacement · maintenance programs · phased work for occupied lots
Asphalt · Memphis, TN
Why asphalt works the way it does in Memphis
About Memphis, TN. Memphis sits on the Mississippi River at Tennessee's southwestern corner, anchored by FedEx world headquarters, the Port of Memphis, a deep medical economy including St. Jude and Methodist Le Bonheur, and a music and tourism base on Beale Street and at Graceland. The metro pulls heavy logistics, medical, and corporate-services employment.
What it means for asphalt. City of Memphis and Shelby County permitting both apply. King's natural Memphis scope is healthcare facility expansion (St. Jude, Methodist, Regional One corridors), hospitality renovation, multifamily, and commercial upfit.
Areas we build asphalt in

What We Do
Parking Lots, Driveways, Mill-And-Overlay & Maintenance
Asphalt paving for commercial and residential — new parking lot installation, driveway paving, full-depth replacement, mill and overlay, crack seal, sealcoat, and restriping. Maintenance programs that extend pavement life and defer the next full replacement.
- New parking lot construction · driveways · full-depth replacement
- Mill-and-overlay · patching · crack seal · sealcoat · restriping
- Phased work for active retail, hospitality, healthcare, and office parking
- ADA-compliant accessible parking · pavement marking · signage and bollards
Transparent Pricing
What Affects the Price
Every job is different. Here's what we look at when we put together your estimate — so there are no surprises on job day.
Total square footage of pavement
Pavement section — asphalt thickness and base stone depth
Subgrade condition and any undercut required
Drainage — curb, gutter, storm inlet, sheet flow
Striping, signage, bollards, wheel stops, and ADA accessible parking
Phasing for occupied parking lots vs. greenfield
We don't quote over the phone. Every estimate is done on-site because that's the only way to give you a number you can count on. No ballparks, no surprises.
Our Process
How We Approach
Asphalt
Subgrade & Base Prep
Subgrade compacted, base stone installed to design depth, and proofroll inspection passed before paving. The base controls the pavement — never compromised to save days.

Pave, Compact & Joint
Asphalt placed at proper mix temperature, compacted to spec density, and joints sealed. Lift thickness per design — single-lift or multi-lift depending on traffic.

Stripe, Mark & Hand-Off
Pavement marking, ADA-compliant accessible parking, signage and bollards installed. Owner walk-through and as-built locations recorded.

Common Questions
Asphalt FAQ
Answer
New parking lot construction, driveways, full-depth replacement, mill-and-overlay, patching, crack seal, sealcoat, and pavement marking. Maintenance programs included.
Ready to Start?
Get Your Free
Asphalt Estimate
Free design and feasibility consult. We listen first, scope honestly, and give you a real number after we see the lot — not a phone ballpark.
Read more about asphalt
Other services we offer
Who this serves in Memphis
Same coverage in nearby cities
Get Your Free Estimate
Ready to Start
Your Project?
Three minutes through the estimator gets you a ballpark range, a calendar slot, and a real reply. Same or next business day, free estimate and scope conversation — no pressure, no SaaS chatbot, just one of our project managers picking up the phone.
- Free estimate & scope conversation
- Same or next business day response
- Licensed · Bonded · Insured · 30+ Years In Business
- Atlanta-Based · 3214 Moccasin Creek Rd., Clarkesville GA
Start The Estimator
A few questions. A real number. A calendar slot.
The estimator on our home page asks a handful of project questions, returns a low/high range, and lets you book the consult — all in about three minutes.
We respond same or next business day. By tapping above you agree to King's privacy policy.